incinirating medical waste in the hospital

incinirating medical waste in the hospital

we use latest incinerator technology with high temperature combustion with 2 or 3 chambers, with wet scrubber or dry scrubber system and auto control system incinerator.

 

medical waste incinerator spare parts in stock for our customer, including air fan, burners, control case, temperature element.
 

the small scale equipment for laboratory incinerator specification like 10kgs per hour is hot sale in market, we supply cheap cost.

Nanjing Clover Medical Technology Co.,Ltd.


Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour 50-100 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100-150 kg/hour 150-200 kg/hour 300-400 kg/hour 500-600 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

 

Controlled hygienic, mechanical or automatic feeding methods must not negatively influence the air supply and temperature in the primary and secondary chambers of the incinerator.

“Each unit shall include a diesel fuel storage tank of sufficient capacity to enable operation of the unit for 5 working days of 10 hours each.

• The unit shall include a pumping system and lines to supply the burners from the tank and the diesel-electric generator.  The pumping system will have two pumps in parallel for redundancy.

• The supply lines will be fabricated from steel tubing and adequately protected and supported against damage during operations and include shutoff valves for each line. 

• The unit shall be equipped with a fuel meter.

Feeding Controlled hygienic, mechanical or automatic feeding methods must not negatively influence the air supply and temperature in the primary and secondary chambers of the incinerator.

Diesel fuel storage and supply “Each unit shall include a diesel fuel storage tank of sufficient capacity to enable operation of the unit for 5 working days of 10 hours each.

• The unit shall include a pumping system and lines to supply the burners from the tank and the diesel-electric generator.  The pumping system will have two pumps in parallel for redundancy.

• The supply lines will be fabricated from steel tubing and adequately protected and supported against damage during operations and include shutoff valves for each line. 

• The unit shall be equipped with a fuel meter.

Electrical supply, generation and wiring “The waste incinerators shall be designed for the following electricity supply:

• 3 phase, 4 wire, 415 V a.c. ±10%, 50 Hz ±3%  

• 3 phase 4 wire, 220 V a.c. ±10%, 60 Hz ±3%

 

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.

Medical Waste Incinerator & Auto Roll Air Filter(Air Purification)

 

Mobile: +86-138139 31455(WhatsApp)